CfD Contract Portfolio Status

Homepage

This dataset includes each CfD Contract, its Maximum Contract Capacity and latest status of each project.

Status of each CfD project is determined based on the notices issued by LCCC when different milestones get past. Start date is the best estimate date on which the generator will start generating.


Additional Metadata

Attribute Value(s)
Keywords LCCC, CfD, Capacity
Licenses OGL-UK-3.0
Contributors LCCC (Author)
Version 2021-10-01


Fields

Column Type Format Title Description
CFD_ID string default CfD ID ID which identifies each CfD generator
Name_of_CFD_Unit string default Name of CfD Unit Name of a CfD Unit
Allocation_Round string default Allocation Round The associated CfD allocation round for the site
Technology_Type string default Technology Type Technologies of CfD generators
Transmission_or_Distribution_connection string default Transmission or Distribution Connection Connection type of the transmission or distribution network
Status string default Status Different stages of CfD contracts. E.g: Pre-Start Date, Post-Start Date,Terminated
Expected_Start_Date datetime %Y-%m-%d %H:%M:%S Estimated Start Date Estimated date on which the generator will start generating
Maximum_Contract_Capacity_MW number default Maximum Contract Capacity (MW) Generators submit an Initial Installed Capacity Estimate (IICE) at the time of application. The IICE is used as a reference point throughout the CfD. For a successful generator, Installed Capacity can only ever be altered lower than the IICE. The IICE can be adjusted downwards by up to 25% by the Milestone Delivery Date