Skip to content

Hadyard Hill Wind Farm

Identifiers

Relationship ID Type ID(s)
Root Dictionary ID 10208
Related Settlement BMU ID T_HADHW-1
Related National Grid BMU ID HADHW-1
Equivalent GPPD ID GBR0003109
Equivalent ESAIL ID HADHW
Equivalent Common Name Hadyard Hill Wind Farm
Equivalent EIC ID 48W00000HADHW-1J
Equivalent REPD ID (Old) N00045W
Equivalent REPD ID (New) 3109


Linked Datasets

Bmu Fuel Types

The "ngc_bmu_id" dictionary field was matched to the "ngc_bmu_id" field in this dataset.

attribute Value
Fuel Type WIND



Plant Locations

The "dictionary_id" dictionary field was matched to the "dictionary_id" field in this dataset.

attribute Value
Longitude -4.70
Latitude 55.25



Wind Farms

The "dictionary_id" dictionary field was matched to the "dictionary_id" field in this dataset.

attribute Value
Plant Type onshore



Global Power Plant Database

The "gppd_idnr" dictionary field was matched to the "gppd_idnr" field in this dataset.

attribute Value
Installed Capacity (MW) 119.6
Longitude -4.7319
Latitude 55.2568
Primary Fuel Type Wind
Owner Scottish and Southern Energy (SSE)
Source UK Renewable Energy Planning Database
URL https://www.gov.uk/government/collections/renewable-energy-planning-data
Geolocation Source UK Renewable Energy Planning Database
PLATTS-WEPP ID 1058973.0
Estimated Annual Generation in 2017 301.5



Annual Output

The "ngc_bmu_id" dictionary field was matched to the "ngc_bmu_id" field in this dataset.

Attribute Year value
Annual Output (MWh) 2016 180848.72
Annual Output (MWh) 2017 216386.14
Annual Output (MWh) 2018 186557.08
Annual Output (MWh) 2019 180649.75
Annual Output (MWh) 2020 199368.94



Capture Prices

The "ngc_bmu_id" dictionary field was matched to the "ngc_bmu_id" field in this dataset.

Attribute Year value
Capture Price (£/MWh) 2016 37.65
Capture Price (£/MWh) 2017 44.02
Capture Price (£/MWh) 2018 58.42
Capture Price (£/MWh) 2019 41.80
Capture Price (£/MWh) 2020 33.77



Load Factors

The "ngc_bmu_id" dictionary field was matched to the "ngc_bmu_id" field in this dataset.

Attribute Year value
Load Factor 2015 0.33
Load Factor 2016 0.21
Load Factor 2017 0.25
Load Factor 2018 0.22
Load Factor 2019 0.20
Load Factor 2020 0.23
Load Factor 2021 0.26



Renewable Energy Planning Database

The "new_repd_id" dictionary field was matched to the "Ref ID" field in this dataset.

attribute Value
Operator (or Applicant) Scottish and Southern Energy (SSE)
Site Name Hadyard Hill
Technology Type Wind Onshore
Installed Capacity (MWelec) 120.0
Turbine Capacity (MW) 2.3
No. of Turbines 52.0
Development Status Operational
Address Hadyard Hill
, East of Girvan
, South Ayrshire
County Strathclyde
Region Scotland
Country Scotland
X-coordinate 226478
Y-coordinate 599253
Planning Authority Scottish Government (S36)
Planning Application Reference 03/01745/DEEM
Planning Application Submitted None
Planning Permission Granted None
Under Construction None
Operational None


Downloads

File Filepath
Attributes 10208.csv


Contribute

We need your help! If you know of any data associated with this power plant which is currently missing then please add it using the relevant Google form which can be accessed with the buttons below. If you are adding an ID from a linkage which is already known you need to only complete the Add New Link form, if the link type is not currently in the dictionary you will need to use the Add New Link Type form.

Thank You!

Add New Link

Add New Link Type